Shopping Cart

Your cart is empty.

Your cart is empty.

The VoIP Lounge 25 Foot Flat Black Long Handset Receiver Curly Phone Cord with Long Lead

Free shipping on orders over $29.99

$9.99

$ 4 .99 $4.99

In Stock

About this item

  • 25 Feet fully stretched, 3.5 Feet coiled (See Full Description Below)
  • Black Color
  • Brand New - Individually Bagged
  • Please read the description regarding Telecom Industry Standard Cord Lengths


The VoIP Lounge Universal Flat Black 25 Foot Handset Cord with long lead. This is a flat black cord that is 25 feet long when it is fully extended to its maximum length, and is about 42 inches in its coiled, unstretched state. Handset cords are rarely used at their maximum length, and most typically usable anywhere from 35% to 75% of their advertised length, depending on how much you want to stretch them. Once stretched to the maximum length, cords do not retain their original shape or quality, so it's important to choose wisely when buying. The advertised size of the full maximum extended length is a Telecom Industry Standard, and not something that is decided by us, or any other manufacturer or seller. Cords & Lengths: Available lengths for most cords are: 7 feet (11 inches coiled / unstretched) 9 feet (15 inches coiled / unstretched) 12 feet (22 inches coiled / unstretched) 25 feet (42 inches coiled / unstretched)


man
September 3, 2025
gives me lots of freedom and hangs just clear of the floor when not in use.
David Miller
August 27, 2025
It’s really high quality and very big. So glad I bought it. Now I won’t pull my phone off my desk!
Philip R. Schrier
August 10, 2025
The last handset telephone cord was getting tangled, and it was too short. This cord is longer and does not get tangled. Thank You
Mary I. Oliver
August 6, 2025
I teach on the phone. Cell and handset battery wears out. I need to be mobile-walk around as I listen to students and reply. Keeps me alert, relaxed. Cord is long enough to go to my door so if someone borrows the phone; I do not need to allow them inside. Might look for a 50 foot one also.
Katrina Coleman
July 31, 2025
Good cord. I like the extended flat tail
UnderCasperStatus
July 29, 2025
Exactly as described. Connects and audio is clear. Bought 2 and thrilled with the performance.
1moreplease
July 5, 2025
Have corded phones at work that only stretch about 3 or 4 feet, with computers 5-6 feet away. On business calls, it's impossible to talk to someone while working those computers. The extended length is exactly what I needed to stay on the phone and still work.
Sissy Kelly
June 22, 2025
For years I have searched for a phone cord that truly does not kink up...I've used the rotating devices, ordered different cords all with the same result - they do not work (at least for me). I ran across this phone cord and it is exactly what I've been looking for. I am beyond happy. I did not know there was a 12-foot; I'm giving the 25-foot to a co-worker and ordered the 12-foot for myself.Thanks, Amazon; I could not have gone one more day with a twisted, kinky phone cord!!!!
man
June 15, 2025
gives me lots of freedom and hangs just clear of the floor when not in use.
David Miller
May 27, 2025
It’s really high quality and very big. So glad I bought it. Now I won’t pull my phone off my desk!
Philip R. Schrier
May 26, 2025
The last handset telephone cord was getting tangled, and it was too short. This cord is longer and does not get tangled. Thank You
Mary I. Oliver
May 17, 2025
I teach on the phone. Cell and handset battery wears out. I need to be mobile-walk around as I listen to students and reply. Keeps me alert, relaxed. Cord is long enough to go to my door so if someone borrows the phone; I do not need to allow them inside. Might look for a 50 foot one also.
Katrina Coleman
April 25, 2025
Good cord. I like the extended flat tail
UnderCasperStatus
April 12, 2025
Exactly as described. Connects and audio is clear. Bought 2 and thrilled with the performance.
1moreplease
February 11, 2025
Have corded phones at work that only stretch about 3 or 4 feet, with computers 5-6 feet away. On business calls, it's impossible to talk to someone while working those computers. The extended length is exactly what I needed to stay on the phone and still work.
Sissy Kelly
February 2, 2025
For years I have searched for a phone cord that truly does not kink up...I've used the rotating devices, ordered different cords all with the same result - they do not work (at least for me). I ran across this phone cord and it is exactly what I've been looking for. I am beyond happy. I did not know there was a 12-foot; I'm giving the 25-foot to a co-worker and ordered the 12-foot for myself.Thanks, Amazon; I could not have gone one more day with a twisted, kinky phone cord!!!!
Recommended Products